X2-Full Enclosed Dual Platform Metal Sheet Laser Cutting Machine
M o d e l ×2-3015 X2-4015 ×2-4020 X2-6020 X2-6025
Power 1.5-20kW 1.5-20kW 1.5-20kW 1.5-20kW 1.5-20kW
Work area 3045*1520mm 4045*1520mm 4060*2030mm 6050*2030mm 6095*2540mm
positioning accuracy ±0.05mm/m ±0.05mm/m ±0.05mm/m ±0.05mm/m ±0.05mm/m
repeatability ±0.03mm ±0.03mm ±0.03mm ±0.03mm ±0.03mm
Maximum operating speed 100m/min 100m/min 100m/min 100m/min 100m/min
Maximum acceleration 1.5G 1.5G 1.5G 1.5G 1.5G
Maximum tabletop load capacity 1000kg 1300kg 1600kg 2400kg 3000kg
APPLICATION INDUSTRY
SHEET-METALWORKING
ADVERTISING INDUSTRY
KITCHENWARE INDUSTRY
SMART HOME
Product Details
Related Cases
Related Post

Time: 12 October, 2022
Egyptian Client: “Ousheng’s cutting accuracy…
Time: 10 January, 2026
Millimeter-precision cutting” architectural sections”…
Time: 12 October, 2017
Ousheng Intelligent Equipment – Your Reliable Global…
Time: 12 October, 2022
Choose Ousheng: Expand globally in aluminum processing…
Time: 15 January, 2025
India Client: “Ousheng’s cutting accuracy…
Time: 20 July, 2023
. Multiple customized aluminum‑processing machines…
No posts found
Time: 27 June, 2026
In the global metal processing, automotive parts, hardware…
Time: 22 October, 2026
Many factory owners ask about the reasonable budget…
Time: 01 August, 2026
For aluminum window and door factories, cutting is…
Time: 22 October, 2026
For aluminum fabrication factory managers and production…
Time: 08 July, 2026
Abnormal alarms and loud strange noise are frequent…
Time: 08 July, 2026
尺寸偏差是铝型材切割加工中非常普遍的问题。许多制造商在使用单头和双头铝型材切割锯后都会遇到长度不一致、角度不均、尺寸不准确以及公差误差等问题。轻微的尺寸误差会导致装配困难,而严重的偏差则会导致批量产品报废,增加生产成本。…
Time: 13 August, 2026
If you work with aluminum profiles, extrusions, tubes,…
Time: 08 July, 2026
铝型材切割面上的毛刺是铝加工生产中最常见的问题之一。许多工厂操作人员在使用单头或双头铝切割锯切割铝型材后,经常会遇到切割边缘粗糙、毛刺锋利、铝屑粘附以及表面不平整等问题。…
Time: 05 July, 2026
Clear comparison of single-head and double-head aluminum…
Time: 08 July, 2026
Air leakage and oil leakage on hydraulic and pneumatic…
No posts found


